Experiences
October 1, 2003 to currently
Freelance Engineer
January 1, 2003 to September 30, 2003
Maintenance (Saraburi plant)
- Increase machine speed project from 78 m/min to 90 m/min (1200x2400x9mm board) without investment cost.
- Modify machine for 1350mm. width and 6 m. length. Budget 3.2 Mbaht
- Install DME2000 sensor for slurry head control.
- Install new feeder(WAM) for feed Ligno to ball mill.
- Feed foam and dispersant concentrate to mixer.
Job title Maintenance Manager
August 1, 2002 to December 31, 2002
Engineering(reorganization)
- Support Lafarge Boral Gypsum in Asia to relocate Gypsum Board plant(speed 75 m/min) from Shanghai to South Korea.(total 8 month from June 2001 to September 2002) Budget 50 MUSD.
- Support LBGA for projects in Asia.
Job title Project Engineer(Electrical)
November 1,2001 to August 1, 2002
Strategy and Technical(reorganization)
- Support Lafarge Boral Gypsum in Asia to relocate Gypsum Board plant(speed 75 m/min) from Shanghai to South Korea.(total 8 month from June 2001 to September 2002) Budget 50 MUSD.
Job title Project Engineer(Electrical)
August 16, 1998 to October 30, 2001
Engineering and Technical
- Support SIGI(INDO) about functional test and start up production.
- Setup the maintenance system for motor, PLC and other at SIGI.
- Concern about electrical job for all projects.
Project(Budget price are electrical only)
- Waste Recycle-SB Budget 113,000 baht
- Painting M/C-NV Budget 150,000 baht
- Perforating M/C-NV Budget 65,000x2baht
- Perforating M/C Budget 65,000 baht
- Dryer modification-SB Budget 500,000 baht
- Casting plaster line-SB Budget 250,000 baht
- Kool Rock panel M/C 1-NV Budget 70,000 baht
- Kool Rock panel M/C 2-NV Budget 150,000 baht
- Aging system-SMP Budget 120,000 baht
- Uniplaster(Thailand) Budget 2,000,000 baht(All)
- TOU and TOD-NV, SB, SK and SMP no budget can save ~100,000 baht/month at SB plant.
- Transfer technology from Pabco : Light weight gypsum(Pabco)-SB, NV and SK.
Other
- Y2K for M/C, PC and other equipment for NV, SB, SK, SMP and TCGP(China).
- Quality audit-SIGI, SK, SB and NV.
- SAP technical support-NV, SB, SK and SMP.
- Barcode setup team-NV, SB, SK and SMP.
Job title Engineer Engineering
August 1, 1996 to August 15, 1998
Electrical Maintenance Engineer at Saraburi plant,
- Start functional test the machinery with supervisors (ABB).
- Test run machinery with supervisors.
- Start production.
- Solve the problem about not proper M/C design.
- Modify M/C to proper design(hardware and software).
- Setup the maintenance system for motor, PLC, equipment etc.
- Support SIGI(INDO) about functional test.
- Improve board trimming by change motor from 3000 RPM to 6000 RPM Budget 180,000 baht
Job title Electrical Maintenance Engineer
April 1, 1995 to July 31, 1996
Production Engineer at Navanakorn plant
Job title Production Engineer
Training and Seminar
- Productivity Improvement by IE Techniques 21 July, 1996
- PLC Allen Bradley Introduction to programming (PLC-5 programmable controller) by Rockwell Automation(Thailand) LTD 27 September, 1996
- SCADA(Citect ver. 5.4) software training by Precision Control(Thailand) LTD 21-23 November 2001
- Maintenance training by Lafarge Industrial Department(at Navanakorn plant) December 2001
- Excel advance by Excutrain 8-9 October, 2002
- Training / Visit France Industrial Department and plants on October 21, 2002 to October 31, 2002
- Problem analysis and decision making by Acclaimed Consultants International Co.,Ltd.10-13 June 2003 Other information
- TOEIC test score 705 on March 17, 2003(listening 405 and reading 300)
Name : Mr.Pongsathorn Choocherd
Date of birth : April 15, 1973
Age : 50 years
Status : Married
Update : 01/01/2024
Education : Bachelor’s degree of Electrical Engineer, Khon Kaen University
Experiences
October 1, 2003 to currently
Freelance Engineer
January 1, 2003 to September 30, 2003
Maintenance (Saraburi plant)
- Increase machine speed project from 78 m/min to 90 m/min (1200x2400x9mm board) without investment cost.
- Modify machine for 1350mm. width and 6 m. length. Budget 3.2 Mbaht
- Install DME2000 sensor for slurry head control.
- Install new feeder(WAM) for feed Ligno to ball mill.
- Feed foam and dispersant concentrate to mixer.
Job title Maintenance Manager
August 1, 2002 to December 31, 2002
Engineering(reorganization)
- Support Lafarge Boral Gypsum in Asia to relocate Gypsum Board plant(speed 75 m/min) from Shanghai to South Korea.(total 8 month from June 2001 to September 2002) Budget 50 MUSD.
- Support LBGA for projects in Asia.
Job title Project Engineer(Electrical)
November 1,2001 to August 1, 2002
Strategy and Technical(reorganization)
- Support Lafarge Boral Gypsum in Asia to relocate Gypsum Board plant(speed 75 m/min) from Shanghai to South Korea.(total 8 month from June 2001 to September 2002) Budget 50 MUSD.
Job title Project Engineer(Electrical)
August 16, 1998 to October 30, 2001
Engineering and Technical
- Support SIGI(INDO) about functional test and start up production.
- Setup the maintenance system for motor, PLC and other at SIGI.
- Concern about electrical job for all projects.
Project(Budget price are electrical only)
- Waste Recycle-SB Budget 113,000 baht
- Painting M/C-NV Budget 150,000 baht
- Perforating M/C-NV Budget 65,000x2baht
- Perforating M/C Budget 65,000 baht
- Dryer modification-SB Budget 500,000 baht
- Casting plaster line-SB Budget 250,000 baht
- Kool Rock panel M/C 1-NV Budget 70,000 baht
- Kool Rock panel M/C 2-NV Budget 150,000 baht
- Aging system-SMP Budget 120,000 baht
- Uniplaster(Thailand) Budget 2,000,000 baht(All)
- TOU and TOD-NV, SB, SK and SMP no budget can save ~100,000 baht/month at SB plant.
- Transfer technology from Pabco : Light weight gypsum(Pabco)-SB, NV and SK.
Other
- Y2K for M/C, PC and other equipment for NV, SB, SK, SMP and TCGP(China).
- Quality audit-SIGI, SK, SB and NV.
- SAP technical support-NV, SB, SK and SMP.
- Barcode setup team-NV, SB, SK and SMP.
Job title Engineer Engineering
August 1, 1996 to August 15, 1998
Electrical Maintenance Engineer at Saraburi plant,
- Start functional test the machinery with supervisors (ABB).
- Test run machinery with supervisors.
- Start production.
- Solve the problem about not proper M/C design.
- Modify M/C to proper design(hardware and software).
- Setup the maintenance system for motor, PLC, equipment etc.
- Support SIGI(INDO) about functional test.
- Improve board trimming by change motor from 3000 RPM to 6000 RPM Budget 180,000 baht
Job title Electrical Maintenance Engineer
April 1, 1995 to July 31, 1996
Production Engineer at Navanakorn plant
Job title Production Engineer
Training and Seminar
- Productivity Improvement by IE Techniques 21 July, 1996
- PLC Allen Bradley Introduction to programming (PLC-5 programmable controller) by Rockwell Automation(Thailand) LTD 27 September, 1996
- SCADA(Citect ver. 5.4) software training by Precision Control(Thailand) LTD 21-23 November 2001
- Maintenance training by Lafarge Industrial Department(at Navanakorn plant) December 2001
- Excel advance by Excutrain 8-9 October, 2002
- Training / Visit France Industrial Department and plants on October 21, 2002 to October 31, 2002
- Problem analysis and decision making by Acclaimed Consultants International Co.,Ltd.10-13 June 2003 Other information
- TOEIC test score 705 on March 17, 2003(listening 405 and reading 300)