PROJECT
2008
TOA PAINT (THAILAND) CO.,LTD.
- Supply / Install (explosion proof system) / Commissioning SIEMENS inverter panel and local explosion proof control panel for tank agitator 22kw./15 kw.

THE SIAM NAWALOHA FOUNDRY CO.,LTD.
- Dismantling and installation all electrical for 1 Ton Fuji Electric Furnace.

THE SIAM NAWALOHA FOUNDRY CO.,LTD.
- Install new Fire Alarm Control panel 20 zone and new cabling to manual and bell station.

TOA PAINT (THAILAND) CO.,LTD.
- Supply / Install (explosion proof system) new LDB panel main 400 AT for new production area.

TOA PAINT (THAILAND) CO.,LTD.
- Install main cable for new training building.

THE SIAM NAWALOHA FOUNDRY CO.,LTD.
- Dismantling and installation all electrical for M1 machine.

THE SIAM NAWALOHA FOUNDRY CO.,LTD.
- Connect High volt 11KV and low volt cable for relocate transformer 2000 KVA and MDB Main 2000 AT.

THE SIAM MOULDING PLASTER CO.,LTD.
Project : New BETA àTotal ~7.8 Mil.Baht
- Supply / Install / Commissioning New 1000KVA transformer and MDB with Cap bank main 1600AT.
- Supply / Install / Commissioning Crusher panel+Roller Mill panel+BETA panel and discharge panel

THE SIAM NAWALOHA FOUNDRY CO.,LTD.
- Supply and install public announcement system “TOA” brand.